品质改变一切 服务成就未来

Quality change everything service achievements future

Essential Oil Bottle Filling Machine Line (10-100ml)
    Publish time 2019-08-27 13:01    

Brief introduction: 
This essential oil filling machine is the new machine which in these years we design and make it. Man can set he nuber of steps peristaltic pumps with microcomputer to perform metering filling (special occasions with ceramic pump). It has the functions: automatic filling, air rinsing empty bottle, automatic plugging, nitrogen purging and capping. The machine is equipped with special internally unique mechanical hand. These can ensure the plug and the out cover to enter the bottle, so that it achieves fully automatic. The machine fully meets with new GMP requirements.

Characteristic: 
1, Be set by microcomputer, high precision, easy operate. 
2, Filling system is drip proof, no dropping or leakage 
3, Use the mechanical hand to plug and press the cover 
4, No bottle, no filling ,no plugging and no capping

5, Monoblock system have safety enclosure and doors

6, Torque adjustment on capper is through HMI 

7, Air rinse before filling and Nitrogen purge before capping on monoblock 

Optional functions:

1. Dosing system has two more options: servo motor driving piston pump and ceramic pump;

2. Plug detection and reject device for cap without plug inside;

3. Ethernet connection for remote excess;

Main technical parameters:

Model

FP-JXS-2

Filling Volume

15-60ml 

Productivity

80b/min@15ml

Filling Precision

≤±1% 

Applicable bottle size

φ10-40mm

Power Supply

220V/50Hz

Capping Rate

≥99%

Air Supply

1.3 m3/h 0.4-0.8Mpa

Power

2.0 kw

Weight

1000 kg

Dimension

2400*2000*1900mm

  Configuration list:

No

Parts

Brand

1

Cylinder

AirTAC (Taiwan)

2

Solenoid valve

AirTAC (Taiwan)

3

Motor

Mitsubishi (Japan)

4

Proximity switch

Schneider (France)

5

Electronic switch

Schneider (France)

6

Encoder

Omron (Japan)

7

Temperature control

Omron (Japan)

8

PLC

Delta (Taiwan)

9

Touch screen

Wenview (Taiwan)


FAQ:

1. When you can arrange the delivery after customers place the order ?

A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered.

2. How long time for installation?

A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.

3. What kind payment be accepted by Fillpack?

A: We can accept L/C,West union,TT

4. How to install my machines when it arrives?how much the cost?

A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation, etc.USD 100/DAY/PERSON salary.


Installation and maintenance:

The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Fillpack, or we can sent our engineers to help you.


Package and shipment