品质改变一切 服务成就未来
Quality change everything service achievements future
Detailed description:
The canning machine is specially designed for the quantitative filling of mixed materials on the basis of digesting and absorbing similar equipment at home and abroad. It is suitable for filling with small filling volume, and adopts telescopic quantitative filling mode. Its volume is accurate. Adjustable, and can carry out no cans, no loading, canning, PLC control, production capacity for frequency control, touch screen operation. This machine is especially suitable for the solid shape canning of the eight-treasure porridge production enterprise.
This machine adopts PLC, frequency converter and man-machine interface control system. It has advanced control technology such as variable frequency speed regulation, automatic filling with cans, no filling and no filling. Through the various sensors on the device, accurate production speed and production quantity can be displayed on the touch screen. The production speed can be set on the touch screen according to user requirements. The whole machine has various protections of the main motor and other electrical appliances, such as overload and overvoltage. At the same time, the corresponding various faults are automatically displayed on the touch screen, which is convenient for the user to find the cause of the malfunction. The main electrical components of this machine adopt international famous brands, and can also be branded according to customer requirements.
Main technical parameters:
Model |
FPKGJ18A |
FPKGJ32A |
FPKGJ42A |
Filling nozzles |
18 |
32 |
42 |
Applicable diameter |
Φ52~99mm |
Φ52~99mm |
Φ52~99mm |
Applicable height |
50~160mm |
50~160mm |
50~160mm |
Capacity |
80~250 cans/min |
80~500 cans/min |
80~600 cans/min |
Motor power |
2.2kw |
3kw |
3kw |
Weight |
1400kg |
1500kg |
2000kg |
Dimension |
2000x1800x2000mm |
2440x2000x2000mm |
2400x2000x2000mm |
1. When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered.
2. How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.
3. What kind payment be accepted by Fillpack?
A: We can accept L/C,West union,TT
4. How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation, etc.USD 100/DAY/PERSON salary.
Installation and maintenance:
The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Fillpack, or we can sent our engineers to help you.
Package and shipment