品质改变一切 服务成就未来
Quality change everything service achievements future
Product Recommendation
The machine is mainly used for washing, filling, sealing non-carbonated drinks such as mineral water, pure water, wine drink. The machine design shortens the time for the drink material contacting with outside, increases the sanitation condition,capacity and economy benefit.
Capability Character
It adopts hanging type of bottle-conveying structure to make bottle model changing more convenient and faster. The main machine adopts advanced PLC control technology.The key electric pieces are all international famous brands.
Technical Parameters
Model |
CGF12-12-6 |
CGF18-18-6 |
CGF24-24-8 |
CGF32-32-10 |
CGF40-40-12 |
CGF50-50-12 |
CGF60-60-15 |
Heads of Washing,Filling,Sealing |
12-12-6 |
18-18-6 |
24-24-8 |
32-32-10 |
40-40-12 |
50-50-12 |
60-60-15 |
Production Capacity (Bottle/Hour) |
2000-4000 |
5000-7000 |
8000-12000 |
12000-15000 |
16000-20000 |
20000-24000 |
25000-30000 |
Suitable Bottle Diameter (mm) |
Φ=50-110 H=170 330-2250ml |
||||||
Spraying Pressure (Mpa) |
0.2-0.3 |
||||||
Motor Power (kw) |
2.2 |
3 |
4 |
5.5 |
7.5 |
11 |
15 |
Overall Dimension(L×W×H) |
2000×1500×2500 |
2600×1920×2550 |
3100×2300×2800 |
3800×2800×2900 |
4600×2800×2900 |
5450×3300×2900 |
6500×4500×2900 |
Weight (kg) |
2000 |
3500 |
4500 |
6500 |
8500 |
9800 |
12800 |
FAQ:
1. When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered.
2. How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.
3. What kind payment be accepted by Fillpack?
A: We can accept L/C,West union,TT
4. How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation, etc.USD 100/DAY/PERSON salary.
Installation and maintenance:
The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Fillpack, or we can sent our engineers to help you.
Package and shipment