品质改变一切 服务成就未来
Quality change everything service achievements future
Features:
a. Our carbonated soda drink Filling Machine include rinsing bottles, filling bottles and capping bottles with PLC controlled. It is can be used for plastic bottles with plastic screw cap, glass bottle with metal screw cap, glass bottle with metal crown cap , etc.
b. All parts which will contact beverages directly adopt SUS304 or SUS316 stainless steels , all the surfaces of the machine accessory will be polished till smooth enough for easily rinsing. The sealing materials are EPDM rubber.
c. PLC controlled, and using electromagnetism valve to control liquid level, keep all the bottles’ beverage level are same.
d. Adopt new type filling valves which are especially designed for plastic bottles. The returned air and the liquid in filling tank are insulated to ensure cleanliness of the filled beverages.
e. Adopt advanced magnet clutches for capping with adjustable torsional moment to ensure capping safely and reliably.
Main parameters:
Model |
RFC-C 8-8-4 |
RFC-C 16-12-6 |
RFC-C 18-18-6 |
RFC-C 24-24-8 |
RFC-C 32-32-12 |
RFC-C 40-40-12 |
RFC-C 50-50-15 |
Capacity |
1500 |
2500 |
4500 |
6000 |
10000 |
15000 |
20000 |
Bottle shape & volume |
Round or Square 200ML-2000ML |
||||||
Bottle dimension |
Bottle diameter :φ50-φ110mm ; Bottle height:150-340mm |
||||||
Cap details |
PE Screw cap, metal crown cap, metal screw cap , metal crown screw cap.etc. |
||||||
Filling precision |
≤+/-5mm |
||||||
Filling pressure(Mpa) |
≤0.4Mpa |
||||||
Power(Kw) |
2.5 |
3 |
3.5 |
4.5 |
6.8 |
8 |
12 |
Dimension(Mm) |
1650*1450*2200 |
2250*1650*2250 |
2600*1965*2250 |
2980*2200*2250 |
3880*2200*2250 |
4000*2650*2500 |
5450*3210*2300 |
Weight(Kg) |
2000 |
2800 |
3500 |
4500 |
5500 |
6500 |
8000 |
Layout of complete soft drink filling line
FAQ:
1. When you can arrange the delivery after customers place the order ?
A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered.
2. How long time for installation?
A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.
3. What kind payment be accepted by Fillpack?
A: We can accept L/C,West union,TT
4. How to install my machines when it arrives?how much the cost?
A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation, etc.USD 100/DAY/PERSON salary.
Installation and maintenance:
The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Fillpack, or we can sent our engineers to help you.