品质改变一切 服务成就未来

Quality change everything service achievements future

Beverage Filling Machine, Soft Drinks Filling Machine
    Publish time 2018-10-11 09:55    

Features:
a. Our carbonated soda drink Filling Machine include rinsing bottles, filling bottles and capping bottles with PLC controlled. It is can be used for plastic bottles with plastic screw cap, glass bottle with metal screw cap, glass bottle with metal crown cap , etc.

b. All parts which will contact beverages directly adopt SUS304 or SUS316 stainless steels , all the surfaces of the machine accessory will be polished till smooth enough for easily rinsing. The sealing materials are EPDM rubber.
c. PLC controlled, and using electromagnetism valve to control liquid level, keep all the bottles’ beverage level are same.
d. Adopt new type filling valves which are especially designed for plastic bottles. The returned air and the liquid in filling tank are insulated to ensure cleanliness of the filled beverages.
e. Adopt advanced magnet clutches for capping with adjustable torsional moment to ensure capping safely and reliably.

Main parameters:

Model

RFC-C 8-8-4 

RFC-C 16-12-6

RFC-C 18-18-6

RFC-C 24-24-8

RFC-C 32-32-12

RFC-C 40-40-12

RFC-C 50-50-15

Capacity

1500

2500

4500

6000

10000

15000

20000

Bottle shape & volume 

Round or Square  200ML-2000ML

Bottle dimension

Bottle diameter φ50-φ110mm ; Bottle height:150-340mm

Cap details 

PE Screw cap, metal crown cap, metal screw cap , metal crown screw cap.etc.

Filling precision

≤+/-5mm

Filling pressure(Mpa)

≤0.4Mpa

Power(Kw)

2.5

3

3.5

4.5

6.8

8

12

Dimension(Mm)

1650*1450*2200

2250*1650*2250

2600*1965*2250

2980*2200*2250

3880*2200*2250

4000*2650*2500

5450*3210*2300

Weight(Kg)

2000

2800

3500

4500

5500

6500

8000

 
Layout of complete soft drink filling line


FAQ:

1. When you can arrange the delivery after customers place the order ?

A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered.

2. How long time for installation?

A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.

3. What kind payment be accepted by Fillpack?

A: We can accept L/C,West union,TT

4. How to install my machines when it arrives?how much the cost?

A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation, etc.USD 100/DAY/PERSON salary.


Installation and maintenance:

The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Fillpack, or we can sent our engineers to help you.

Package and shipment