品质改变一切 服务成就未来

Quality change everything service achievements future

5 Gallon Water Filling Machine
    Publish time 2018-10-11 10:01    

Introduction:

This water filling line specially produces 5 gallons barreled drinking water. This series barreled filling production line integrates bottle washer, filler and sealer into one unit. In order to achieve the purpose of washing and sterilizing, bottle washer adopts multiple liquid injections washing and disinfectant spray, and washing solution can be used circularly. The sealer can seal bottle caps automatically. This filling line equips with water spraying device to sterilize caps of bottles in order to ensure those caps are aseptic and healthy. This line also can automatically carry out bottle washing, sterilizing, filling, capping, counting and products discharging. It has features of complete functional, novel design, and high degree of automation. It is a new kind of barreled water auto-producing line, which integrates mechanism, electricity and pneumatics technologies together.

Technical parameters:

Model

QGF-100

QGF-240

QGF-300

QGF-450

QGF-600

QGF-900

QGF-1200

Filling heads

1

2

3

4

8

8

8

Volume(L)

18.9

18.9

18.9

18.9

18.9

18.9

18.9

Barrel Size(mm)

Φ270X490

Φ270X490

Φ270X490

Φ270X490

Φ270X490

Φ270X490

Φ270X490

Capacity(b/h)

80-100

200-240

250-300

400

800

800

800

Gas Pressure

(Mpa)

0.4-0.6

0.4-0.6

0.4-0.6

0.4-0.6

0.6

0.6

0.6

Gas Consumption

(m3/min)

0.37

0.37

0.6

0.8

1

1.5

1.8

Moto Power(kw)

1.38

1.75

3.8

3.8

7.5

9.75

13.5

Rated Voltage

380V/50HZ

380V/50HZ

380V/50HZ

380V/50HZ

380V/50HZ

380V/50HZ

380V/50HZ

Weight(kg)

680

800

1500

2100

3000

3500

4500

 

 
FAQ:

1. When you can arrange the delivery after customers place the order ?

A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered.

2. How long time for installation?

A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.

3. What kind payment be accepted by Fillpack?

A: We can accept L/C,West union,TT

4. How to install my machines when it arrives?how much the cost?

A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation, etc.USD 100/DAY/PERSON salary.


Installation and maintenance:

The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Fillpack, or we can sent our engineers to help you.


Package and shipment