品质改变一切 服务成就未来

Quality change everything service achievements future

Automatic Oil Filling Machine By Flow Meter
    Publish time 2018-10-11 11:10    

Major characteristics

This machine is used for liquid filling. It can finish a series of operations automatically, such as bottle inlet, quantified filling, bottle outlet,etc. It is a nice choice for oil, foodstuff, pharmacy, beverage and chemical industries.

Features:

1This machine adopts PLC, touch screen control panel, flow meter instrument to adjust and control. It is convenient to adjust.
2Each filling head has the flow meter that can be regulated and micro adjusted.
3photoelectric sensors, proximity switches, etc. are used in advanced sensing elements, so that no bucket, no filling, if barrel blocking ,the host will automatically stop and alarm. 
4Diving filling nozzles can effectively reduce the generation of foam, can meet the different characteristics of the filling material.
5The whole machine gets GMP standard. It is easy to disassemble clean and maintain ,and the parts which contact with the filling products are made of high quality stainless steel . The whole machine is safe . Environmental, sanitary. It can adapt to various kinds of working places.

Main technical parameters

1Dimension (L * W * H): 2500mm*1700mm*2300mm
2filling heads:2, 4, 6, 8...
3suitable bucket: Length:160mm~360mm Width140mm~260mm Height250mm~500mm
4bung diameter40mm
5Packing specifications5L~30L
6production capacity: ≤ 600 barrels / hour (with water as the medium) 
7measurement erro≤±0.2%F.S
8with power220V;50HZ
9the host power2KW
10gas source0.55MPa~0.65MPa clean and stable gas


FAQ:

1. When you can arrange the delivery after customers place the order ?

A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered.

2. How long time for installation?

A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.

3. What kind payment be accepted by Fillpack?

A: We can accept L/C,West union,TT

4. How to install my machines when it arrives?how much the cost?

A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation, etc.USD 100/DAY/PERSON salary.


Installation and maintenance:

The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Fillpack, or we can sent our engineers to help you.


Package and shipment