品质改变一切 服务成就未来

Quality change everything service achievements future

Automatic Powder Filling And Capping Machine
    Publish time 2018-10-11 16:32    

Introduction:

The monobloc machine can finishing measuring, filling capping etc. because of original design, it is more suitable for packing powdered material that is easy to flow, like veterinary drug, sugar, glucose, carbon dust, talcum powder, essence etc.

Except motor, the shell of the whole machine is 304 stainless steel, and the powder contact part is SS 316.combined transparent work bin, easy to dismantle without tools. Adopts servo motor to drive auger, with the advantages of durable, accurate location, stable function etc. the machine is controlled by PLC, with stable working, anti-distraction, high filling precision etc.


Feature
:

1. The powder filling machine is mainly used for medical industries. 

2. The machine fills automatically and completes the measurement.

3. The whole machine is made of SUS304 stainless steel.

4. It is controlled by the PLC touch screen which can show us Chinese and English, so the operate is simple.

5. The machine dosing with volumetric screw.

6. The filling volume can be settled in touch screen. It is combination of totally enclosed, stainless steel and organic glass hopper. It is convenient to remove and wash.                                                           

7. The filling range is widely. It can be adjusted. It is used for different volume.

8. The machine has the function: no bottle, no fill.

9. The parts which contacts the powder is made of SUS316 stainless steel material.

10. The machine fully meets with GMP requirement.


Technical P
arameter

1. Production capacity: 20-40 b/min

2. Filling volume: 20-100g

3. Filling heads: 1 or 2;  capping heads: 1 or 2

4. Applicable specification: customized

5. Filling error:≤±1%

6. Voltage:380v/50HZ; Power:2.2kw

7. Dimension: 2500*1300*1750mm

8. Weight: 600kg



FAQ:

1. When you can arrange the delivery after customers place the order ?

A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered.

2. How long time for installation?

A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.

3. What kind payment be accepted by Fillpack?

A: We can accept L/C,West union,TT

4. How to install my machines when it arrives?how much the cost?

A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation, etc.USD 100/DAY/PERSON salary.


Installation and maintenance:

The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Fillpack, or we can sent our engineers to help you.


Package and shipment