品质改变一切 服务成就未来

Quality change everything service achievements future

Oral Liquid Filling Capping Machine
    Publish time 2018-10-11 16:46    

Introduction:

Washing, drying, filling and capping line, fully in accordance with GMP standards, designed for the production of oral liquid high-quality, high-yield linkage line. The line consists of QCLX40 vertical washing machine, GMSU-400W mesh belt tunnel sterilization oven and KGZX8 oral liquid filling mill. It can complete ultrasonic rough washing, water, steam alternate high pressure spray washing, drying sterilization and filling and capping process. This line is equipped with advanced instruments and meters at home and abroad, featuring high production capacity, high process quality, stable and reliable performance and beautiful appearance. This machine can be used for the production of oral liquids of different specifications. The machines that make up this line can be used alone.


Main equipment content

1, QCLX40 vertical ultrasonic bottle washer

2, GMSU-400W mesh belt tunnel sterilization oven

3, KGZX8 oral liquid filling machine


Main technical parameters of linkage line

1. Oral liquid bottle washing, drying, filling and capping line

1) Specifications: 5-25ml

2) Production capacity: 12,000 bottles / h (based on 10ml, maximum)

3) Measurement error: ≤ ± 2%

4) Breakage rate: 1%

5) Passing seal sealing pass rate: 98%

6) Total power: 36KW

7) Dimensions: 9070 × 2150 × 2050 (mm) (length × width × height)

8) Total weight: about 5500kg


FAQ:

1. When you can arrange the delivery after customers place the order ?

A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered.

2. How long time for installation?

A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.

3. What kind payment be accepted by Fillpack?

A: We can accept L/C,West union,TT

4. How to install my machines when it arrives?how much the cost?

A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation, etc.USD 100/DAY/PERSON salary.


Installation and maintenance:

The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Fillpack, or we can sent our engineers to help you.


Package and shipment