品质改变一切 服务成就未来

Quality change everything service achievements future

Cream Jar Filling And Capping Machine
    Publish time 2018-10-11 17:05    

Introduction:
This cream jar filling capping machine has the functions such as automatic screw type bottle feeding, bottle detecting (no bottle no filling, no bottle no cap feeding ), filling, cap feeding and capping automatically. 

Characteristic:

Suitable filling material

This machine adopts piston pump, which is suitable for all kind thick & sticky materials, with high filling speed and high filling precision. For filling corrosive, the position pump will be made by silicon rubber, Teflon, ceramics and other corrosion resistance materials.

Main component:

All use word-class famous brand. All the material is stainless steel 304  

PLC Delta (Taiwan) Human-computer touch screen Delta (Taiwan)  Cylinder Airtac (Taiwan)  Photo sensor Omron (Japan)  Servo motor Mitsubishi (Japan)

Controlling system

The machine adopts full-auto PLC and human-computer touch screen control system. For different volumes adjustment, we set several procedures, mode 1, mode 2, mode 3, mode 4``` Operators do not need too much complicated adjustments, the filling machine can switch between the three models easily.

Different volume adjustment

By inputting parameters on HMI, it can easily fill all the material from big volume to small volume ml.

Bottle position correct device

To ensure the bottles and filling nozzles are in the correct position, we add a special bottles position device to make the whole filling process smooth and stable. No bottle no filling.

Buffering Tank:

Equip float valve level controller in the buffering tank to feed material automatically with mixing function to keep the material even and in certain temperature!

Filling nozzles

The filling nozzles are specialized made to fulfill non-drip.


Main parameters:
Filling volume: 1~250ml
Filling speed: 30 jars/min 

Filling precision: ≥99% 

Finished product rate of cap drop: ≥99%

Main machine power: 1KW 220V stepless shift


FAQ:

1. When you can arrange the delivery after customers place the order ?

A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered.

2. How long time for installation?

A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.

3. What kind payment be accepted by Fillpack?

A: We can accept L/C,West union,TT

4. How to install my machines when it arrives?how much the cost?

A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation, etc.USD 100/DAY/PERSON salary.


Installation and maintenance:

The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Fillpack, or we can sent our engineers to help you.


Package and shipment