品质改变一切 服务成就未来

Quality change everything service achievements future

Auto Liquid Filling Machine Line For Essential Oil
    Publish time 2018-10-11 16:56    

Application:
It is applied for low dose liquid and oil filling, such as shampoo(for hotel),
 electronic cigarette, e-liquid etc.

Functionsautomatic bottle arranging, filling, plugging, cap screwing, labeling. It is equipped with automatic internal plug arranging and external cap pluging testing  which enables non-external pluging without internal plug and elimination of non-external plug. The labeling adopts belt rolling structure with fast rolling structure and 8-D adjustment of angle label, which realizes the labeling of two symmetric labels or high-precision labeling.

Characteristic: 
1, Be set by microcomputer, high precision, easy operate. 
2, Filling system is drip proof, no dropping or leakage 
3, Use the mechanical hand to plug and press the cover 
4, No bottle, no filling ,no plugging and no capping

5, Monoblock system have safety enclosure and doors

6, Torque adjustment on capper is through HMI 

7, Air rinse before filling and Nitrogen purge before capping on monoblock 

Optional functions:

1. Dosing system has two more options: servo motor driving piston pump and ceramic pump;

2. Plug detection and reject device for cap without plug inside;

3. Ethernet connection for remote excess;

Main technical parameters:

Scope of filling

10~50ml

Capacity

3000~3600 Psc/h

Filling precision

±1.5%

Material viscosity

≤7000 cp

Air Pressure

0.6~0.8MPa

Power Supply

380/220V (Optional)

Configuration list:

No

Parts

Brand

1

Cylinder

AirTAC (Taiwan)

2

Solenoid valve

AirTAC (Taiwan)

3

Motor

Mitsubishi (Japan)

4

Proximity switch

Schneider (France)

5

Electronic switch

Schneider (France)

6

Encoder

Omron (Japan)

7

Temperature control

Omron (Japan)

8

PLC

Delta (Taiwan)

9

Touch screen

Wenview (Taiwan)

FAQ:

1. When you can arrange the delivery after customers place the order ?

A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered.2. How long time for installation?

A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.

3. What kind payment be accepted by Fillpack?

A: We can accept L/C,West union,TT
4. How to install my machines when it arrives?how much the cost?

A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation, etc.USD 100/DAY/PERSON salary.


Installation and maintenance:

The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Fillpack, or we can sent our engineers to help you.


Package and shipment