品质改变一切 服务成就未来

Quality change everything service achievements future

Aerosal Cans Filling Machine
    Publish time 2018-10-11 17:40    

Features: 

Aerosal Cans Filling Machine is special the designed according to customers’products in my company. Most equipments belong to the non-standard production, the equipment is fully automatic filling production line and more suitable for mass production the enterprise.

Aerosal Cans Filling Machine, with nice appearance and reasonable structure;PLC control; high degree of automation; the whole machine use safety, simple and flexible operation.

Aerosal Cans Filling Machine main material: material contact part for shell adopts SUS 304 stainless steel, and stainless steel is inferior smooth surface.

Aerosal Cans Filling Machine main machine and single figure size are marked in the diagram

In the design of Aerosal Cans Filling Machine, our company try to consider fillowing two aspects :

A: full set of production line adopts PLC control, high degree of automation.
B: saving equipment investment costs and achieve high yield is considered for buyer.Based on customer's technical requirements, our company will determine the best solution for this product filling production line.


Equipment list:

1, Bottle feeding table
2, Automatic servo control linear type filling machine
3, Auto-aerosol plugging, crimping and gas charging machine(2 sets)
4, Check Weigher
5, Water-bath leakage checking
6, 2 heads spray nozzle pressing machine
7, Automatic cap-loading and capping machine
8, Inkjet printer
9, Accumulating table

Main technical parameters:

Applicable valve lid: φ 13- φ 31.5mm (can be customized)

Diameter of the inhalator jar: φ 15- φ 100mm (can be customized)

Height of the inhalator jar: 25-300mm (can be customized)

Filling precision: ≤± 1%

Filling amount: customized

Filling amount of rejecting preparation: customized

Filling precision of rejecting preparation: ≤± 1%  

Producing ability: 2,000-3,000 can/hour



FAQ:

1. When you can arrange the delivery after customers place the order ?

A: Normally production time is around 30-60days,the exactly depend on what kind of machine you ordered.

2. How long time for installation?

A: According your machines order,we will arrange one or two engineers to your factory,it will take about 1 to 2 weeks.

3. What kind payment be accepted by Fillpack?

A: We can accept L/C,West union,TT

4. How to install my machines when it arrives?how much the cost?

A: We will send our engineers to your factory to install the machines and train your staff how to operate the machines.Customer pay air tickets go and back,accommodation, etc.USD 100/DAY/PERSON salary.


Installation and maintenance:

The machines should have good maintenance twice for 6 months,and for installation, you can get the manual guide from Fillpack, or we can sent our engineers to help you.


Package and shipment